Steel Structure Supervisor

 

Reports to: Construction Manager

Area superintendent

 

Duration : 10 Months

Location: Tavaux

 

Field safety responsibilities

- Implementing HSE procedures and standards in compliance with applicable laws,

Health and Safety Documentation and Environmental Management Manual.

- Verifying that suppliers work in a safety manner.

- Be diligent in correcting unsafe acts, unsafe behaviours and unsafe conditions.

- Through the Subcontractors field supervisors/foreman to ensure team members are

trained for their duties as per the Project safety requirements and Subcontractors

employees are actively involved in the project safety program.

- Hold regular safety meetings with Subcontractor discipline supervisors.

- Make sure that work permits are obtained before start any related activity and to

ensure compliance to permit conditions.

- Conduct evaluations of works scope, area condition and specific equipment

inspections prior starting field activities and to ensure that hazards and abatement

measures are communicated to Subcontractor field supervisors.

- Make sure Subcontractors observe project safety policies and procedures and oblige

them to eliminate any dangerous situation or any non-compliant equipment/tool.

- Be diligent in reporting to the appropriate level of Construction Supervision and to

Subcontractor management all unsafe acts, unsafe behaviours and unsafe conditions.

- Being responsible for the highest standards in housekeeping for assigned area, to

make safety walks minimum once a day to verify the area housekeeping and to

promptly inform Safety Superintendent/supervisor about unsafe work procedures.

- Participate in area safety assessment.

- Participate in Subcontractor toolbox sessions and monitor crew attendance.

- Assist in incident investigations.

Common Field job responsibilities

- Maintain close liaison with other discipline supervisors working in the area in order

to coordinate all classes or work in the area;

- Make sure that materials used are in accordance with project technical documents

and applicable codes and specifications.

- Check the efficient productivity of Subcontractors labour with regards to the quality

and quantity (jointly with project control).

- Monitor Subcontractor execution of the work in order to maintain the program.

- Assure that all works are carried out on schedule, otherwise check deficiency and

refer to Construction Manager, in order to promptly define and implement corrective

actions that permit to comply with the schedule.

- Verify and discuss with Construction Manager and Field Project Engineer eventual

modification or any difference raised on the activity relevant to previous and

following points and cooperate with them to issue Sketches Layout (SKL) for the

relevant modification, when works must be executed in different way as indicated

on drawings.(If cost or schedule impacts arise, it is mandatory to get approval from

Construction Manager).

- Record any modification after approval and in cooperation with Construction

Manager inform the Subcontract Administrator if involving contractual changing.

- Prepare and fill the Request of Work Execution (R.W.E.) form for any extra work

out of contract or for modification, for further approval by other functions, before

the execution of the work itself, as per procedure by Subcontracting Department.

- Make sure Subcontractors observe safety procedures and job site activity regulations

and oblige them to eliminate any dangerous situation. Make safety walks minimum

once a day to keep Safety Superintendent informed about unsafe work procedures.

- Make sure that "Work Permits" are obtained before start any work when required.

- Check that Subcontractor is working on the base of last edition of all drawings and

other technical documents (jointly with QA/QC leader).

- Check by the "Manpower presence report" the quantity of Subcontractor's manpower

present in site (jointly with Subcontracting Manager).

- Check, sign and collect all Subcontractor Time Sheets when the work is reimbursed

on hourly basis.

- Prepare/check Subcontractor's monthly/weekly progress of work and transmit

relevant data to Project Control.

- Check the execution of the works, which must be in accordance with technical

documentation, client & Subcontractor Quality Plan, work progress, applicable

codes and rules, authorizing consequently the activity of accounting for the installed

quantities. Take action to correct any deficiency.

- Fill the daily log record book.

- Ensure in advance that no hold up of Subcontractor work can occur due to lack of

needed engineering documents and materials, or work area accessibility. This to

avoid Subcontractor claims (jointly with Project Control and Field Engineer).

- Provide/Check for accounting.

- Prepare, issue to Subcontractor, and file Construction and Final Punch Lists, and

follow up the completion of relevant outstanding works.

Field job responsibilities

- Make sure that Subcontractor material stocks are sufficient to keep up with work's

schedule

- Check Subcontractor field surveying, establish with Subcontractor reference bench

marks for elevation and alignment as per scope of works request and check their

correct execution (including topographical calculations) and send a check advise

in time to the Client

- Check proper execution of the Subcontractor work and check any part for concrete

construction preparation before concrete is poured and record it

- Check and approve alignment and elevation of foundations, and type and position

of anchor bolts, plates and templates and record it

- Make sure that materials used are in accordance with project technical documents

and applicable codes and specifications

- Supervise the erection of steel structures, steel work components, platforms and

ladders

- Ensure that client Subcontractor views steel structure foundation drawings for size,

range and placement of shims

- Ensure that Subcontractor checks and accepts location, size, projection and

condition of anchor bolts prior the work starts

- Prior to starting work the Subcontractor must produce a method statement which

shows:

Location of crane/s

Material lay down/preassembly area.

Location of warehouse

Method of bolting at height e.g. scaffold, man box or from steelwork with safety

- Ensure that Subcontractor uses the correct size and type of spanner for bolting up

- Ensure Subcontractor can remove slings safely

- Ensure that Subcontractor ‘slings’ the steel members correctly with nylon type

slings and no lift takes place without tag lines

- Ensure that the Subcontractor carries out repairs to any damage of the steelwork

finish coat, e.g. galvanizing as per the approved repair procedure

- Ensure that machine bolts are installed the correctly

- Ensure steel structures are aligned and leveled by client independent surveyor

before final bolting up. Witnessed and signed off

- Ensure that bolts are tightened as per specification using a torque wrench witnessed

and signed off

- Ensure nuts and bolts are greased as per specifications

- Ensure that any steelwork repairs are carried out with an approved procedures,

qualified welders, approved consumables, all holes are drilled not flame cut.

Repair work is cleaned and recoated as per approved finish coating repair

Procedure.

 

 

Additional Safety requirements

To enter the plant of Tavaux, the Client Solvay requests the following training

certificate:

- Niveau 1 France Chimie - Formation à la sécurité des personnels des entreprises

extérieures intervenant sur sites chimiques et industriels (following France-

Chimie DT40 framework) : 1 day of training

Note: B-VCA training certificate is considered equivalent to the Niveau 1

training.

For all construction staff dedicated to Permit To Work Management and Supervision

the following trainings are requested:

- Niveau 2 France Chimie - Formation à la sécurité des personnels des entreprises

extérieures intervenant sur sites chimiques et industriels (following France-

Chimie DT40 framework) : 2 days of training

- Niveau 1 France Chimie - Formation à la sécurité des personnels des entreprises

extérieures intervenant sur sites chimiques et industriels (following France-

Chimie DT40 framework) : 1 day of training

Note: VOL-VCA training certificate is considered equivalent to the Niveau 1

and Niveau 2 trainings.

3.3 Language

Language of the Project is English. However knowledge of French language is required.