Expert for Underground structures

Apply now »

Date: Mar 28, 2025

Location: Ninh Thuan, Ninh Thuan, VN

Company: Bureau Veritas

MAIN TASKS

- Support to review the design, assess and ensure the structure of the tunnels, vertical shaft and powerhouse meeting design standards, safe construction, schedule and quality.
- Support to examine the construction method in accordance with latest advanced technology options, ensuring the construction of waterway (including over 400m vertical wells and underground powerhouse), ventilation, drainage, fire prevention, ensuring safety, schedule and quality.
- Coordinate to establish progress charts to ensure the harmonious coordination of construction and installation works to meet schedule and target.
-At the PMB3’s request, Support to calculate 2D and 3D structures for underground powerhouse with appropriate software, preferably using ANSYS or PLAXIS 3D software. The calculation must have good coordination with geotechnical engineers to achieve the most reasonable solutions.
- Support PMB3 in all phases, as described in Specific Tasks of SSC.

REQUIREMENTS

Education: Graduate in construction engineering of underground structure
Experience:
- Experience relevant to applied position: 10 years;

- Chair the calculation of structure works of similar project:1 project within last 15 years;

 

Apply now »