Project Planning & Control (Data Center)
Apply now »Date: 6 Mar 2026
Location: Jakarta, Jakarta, ID
Company: Bureau Veritas
- Academic Background: Bachelor’s Degree in Engineering (Civil, Electrical, or Mechanical) or Construction Management. An M&E background is highly valued due to the technical nature of data centers.
- Professional Experience: Minimum of 3–5 years of experience in project planning and scheduling, specifically within Mission-Critical infrastructure (Data Centers, Power Plants, or Semiconductor Labs).
- Software Proficiency:
- Expert level in Oracle Primavera P6 or Microsoft Project.
- Advanced MS Excel skills for complex data modeling and dashboarding.
- Knowledge of BIM 4D (e.g., Navisworks) for visual schedule integration.
- Technical Knowledge: Solid understanding of Data Center Commissioning Levels (L1 to L5) and Uptime Institute Tier Standards.
- Methodological Expertise: Strong mastery of Critical Path Method (CPM), Earned Value Management (EVM), and Productivity Analysis.
- Certifications: Professional certification such as PMP (Project Management Professional) or PSP (Planning & Scheduling Professional) is a plus.
- Create and maintain the Integrated Master Schedule (IMS) covering Civil, Structural, Architectural (CSA), and intensive Mechanical & Electrical (MEP) works.
- Develop a Cost-Loaded Schedule to align physical milestones with financial forecasting and cash flow management.
- Perform regular site inspections to verify physical progress and ensure the accuracy of the Schedule Performance Index (SPI) and Cost Performance Index (CPI).
- Track "Value of Work Done" (VOWD) to validate subcontractor payment applications.
- Closely monitor the procurement, manufacturing, and delivery timelines for critical assets (e.g., Chillers, UPS, Transformers, and Gensets) to prevent site bottlenecks.
- Identify and manage the Critical Path to ensure the Ready for Service (RFS) date is met.
- Perform Time Impact Analysis (TIA) for any Design Variations or Site Instructions to assess their effect on the project completion date.
- Design Recovery Schedules or acceleration plans (crashing/fast-tracking) if the project deviates from the baseline.
- Produce high-quality Weekly and Monthly Executive Dashboards for global tech clients and internal management.
- Maintain a Schedule Risk Register and provide early warnings on potential delays related to power grid connection or local authority approvals.